Under a warm but thankfully rain free morning, seven members of the LPYC tackled several maintenance jobs. First up was replacing the old rusted mast crane cable. After some initial struggles with the old wire, the new wire attached to the old, to be pulled through the top pulleys of the mast crane.



While rest of the crew tackled painting the Knotta Yachta barge with a fresh coat of stain/sealer to the deck and tables and benches on the barge.



Thanks to Ashley, Brent, Peter, Ben, Joe, Steve, and Lynn for making the work day such a success.